Skip to content
ATD

Shaping a long slope at Naujoji Anglija

ATD — MB ATD.LT

At Naujoji Anglija, we had to shape a long slope to the required levels, keeping the surface even without dips or bends. There was no access from the top, so we worked from below with several long-reach excavators. That made the grading much harder. We covered the seeded area with agricultural fleece to help germination and protect the seeds from rain and birds.

Work in progress and results

An excavator shaping a long slope beside the Naujoji Anglija buildings
1 / 5An excavator shaping a long slope beside the Naujoji Anglija buildings
An evenly shaped continuous slope along residential buildings
2 / 5An evenly shaped continuous slope along residential buildings
A shaped slope and work in progress viewed from below
3 / 5A shaped slope and work in progress viewed from below
The slope covered with agricultural fleece during lawn germination
4 / 5The slope covered with agricultural fleece during lawn germination
The long fleece-covered slope at the Naujoji Anglija development
5 / 5The long fleece-covered slope at the Naujoji Anglija development
Call usGet a quote