The Belmontas project: working through a 97 cm entrance
ATD — MB ATD.LT
The entrance to the Belmontas site was just 97 cm wide. We did most of the work with shovels and wheelbarrows; a very small loader fitted through for some tasks. We replaced the soil, removed a retaining wall and built a stone slope in its place. We poured a concrete path, laid stone paving, installed irrigation and put down mole protection mesh. Almost all the materials had to be moved by hand. The finished views are stills from a video.
Work in progress and results